Schaeffler REPXPERTS share step-by-step guide for technicians.
Schaeffler is this week explaining the clutch replacement process on a 2011 Volkswagen Caddy fitted with a 1.6 TDI common rail CAYD engine for GW readers.
The customer’s complaint is that the clutch slips under load, a short road
test confirmed clutch slip and with a mileage of over 92,000 clutch replacement was advised.
Volkswagen introduced the Caddy to Europe 35 years ago in 1982, with the current model being the third generation, it is available in two body sizes and many variants, this model Caddy is based on a Volkswagen Touran with Volkswagen Golf Mk 5 front suspension, and won best small van of the year
in 2007 and 2008.
The Volkswagen Caddy shares the same platform as other VAG models with a transverse engine/gearbox arrangement, so there is a good chance this will look quite familiar when the bonnet is raised.
We used the following workshop equipment for this repair, a scissor lift, transmission jack and an engine brace.

With the vehicle positioned on the ramp, open the bonnet and remove the engine cover, air intake ducting and air filter assembly, disconnect the battery and remove the battery followed by the battery carrier, this now exposes the top of the gearbox giving us good access for component
removal (figure 1).
Disconnect the gear change cables from the selector linkage, remove the three bolts from the gear cable support bracket and stow in the bulkhead area.

Remove the plastic quadrant (figure 2) from the selector mechanism by removing the retaining clip, this will ensure the quadrant is not damaged during the gearbox removal and installation, remove the centre nut from
the selector mechanism and remove the gear change weight.

Now remove the clutch slave cylinder assembly, inspect the slave cylinder for any fluid leaks or wear to contact areas, we found wear on the end of the slave cylinder push rod (figure 3), so a clutch slave cylinder replacement was advised.
Disconnect the earth cable from the bell housing bolt, reverse light switch wiring multiplug and then the wiring from the starter motor, at this point the top starter motor bolt and top bell housing bolts can be removed.
Slacken both front wheel locking bolts with a bar and then raise the ramp to waist height, remove both front wheels and the N/S/F wheel arch liner, then raise the ramp to access the underside and remove the engine under tray.

Remove the gearbox pendulum mounting (figure 4), remove the six
driveshaft flange retaining bolts from both driveshaft’s, disconnect the ball joints from bottom suspension arms and release, there will now be enough clearance to move the driveshaft’s away from gearbox and secure to aid gearbox removal, the O/S gearbox output flange can now be removed by removing the centre bolt, be careful when removing the flange as some gearbox oil can run out (figure 5).

Now remove the bottom bell housing bolts, bottom starter motor bolt and the starter motor, lower the ramp and support the engine with an engine beam or support frame, release the gearbox mounting and then lower the engine on a beam to a position that the gearbox can be removed, raise the vehicle and support the gearbox with a transmission jack, the gearbox
mounting bracket bolts can now be accessed from the N/S/F wheel arch area, remove the three bolts and the bracket (figure 6), remove the final bell housing bolts and then remove the gearbox with the aid of the transmission jack.

With the gearbox removed, the clutch was removed and as diagnosed, the clutch had reached the end of its service life, the solid flywheel was inspected and confirmed to be ok and the “glaze” was removed from the flywheel face using emery cloth.

Then clean the flywheel and back plate area to remove the old clutch dust, remove the clutch release arm, bearing and gearbox input shaft sleeve and clean the clutch dust out of the bell housing area, lubricate the gearbox input shaft splines with high melting point grease and then slide the new clutch plate onto the input shaft to confirm the splines are correct and to dissipate the grease evenly, then wipe off any excess.

Now fit the new clutch assembly using a clutch alignment tool (figure 7), always inspect the release arm and pivot points, we noticed some wear to the pivot point, so this was replaced (figure 8) along with the release arm that is provided in the clutch kit.
Fit the new input shaft sleeve, clip the new release bearing into the release arm, apply a small amount of high melting point grease to the pivot points
and then fit the release arm and bearing securing the pivot point with the retaining clip.
Ensure the gearbox alignment dowels are still installed correctly in the engine block and then refit the gearbox, once secured in position the free play on the release arm can be felt to ensure correct fitment before full installation is carried out in reverse order of removal.
A new clutch slave cylinder was fitted at this point and the clutch hydraulic system was gravity bled, torque bolts to the manufactures specifications, check and top up the gearbox oil level as required, also ensure all electrical items are reset after the battery has been connected, finally, carry out a full road test to ensure clutch and gearbox operation are correct.
Check out the full workshop instructions and online support by clicking here, or contact the LuK Technical Hotline on 08457 001100.